Currently showing National Level or with State-wise Aggregated Figures
Data at National Level - India
Data at State Level - Andhra Pradesh Arunachal Pradesh Assam Bihar Chhattisgarh Goa Gujarat Haryana Himachal Pradesh Jharkhand Karnataka Kerala Madhya Pradesh Maharashtra Manipur Meghalaya Mizoram Nagaland Odisha Punjab Rajasthan Sikkim Tamil Nadu Telangana Tripura Uttar Pradesh Uttarakhand West Bengal
Data at Union Territory Level - Andaman & Nicobar Islands Chandigarh Dadra and Nagar Haveli and Daman and Diu Delhi Jammu & Kashmir Ladakh Lakshadweep Puducherry
Data at Regional Level - Eastern Hindi Belt North East Northern Southern Western & Central
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2024-2025)
- State-wise Installed Capacity of Solar Energy Projects in India
(As on 31.01.2025)
- Funds Allocated and Utilized for Development of Solar Energy Projects in India
(2020-2021 to 2024-2025-upto 31.12.2024)
- Selected State-wise Capacity Sanctioned for Solar Parks under Scheme for Development of Solar Parks and Ultra Mega Solar Power Projects in India
(As on 31.10.2024)
- Selected State-wise Funds Released to Promote Solar Energy under Central Public Sector Undertaking (CPSU) Scheme in India
(2021-2022 to 2023-2024)
- Selected State-wise Funds Released to Promote Solar Energy under Solar Roof Top Scheme in India
(2021-2022 to 2023-2024)
- Selected State-wise Funds Released under Development of Solar Parks and Ultra Mega Solar Power Projects in India
(2021-2022 to 2023-2024)
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2023-2024)
- State-wise Installed Capacity of Solar Energy in India
(As on 31.10.2024)
- Installed Capacity of Solar Energy in India
(2014-2015 to 2022-2023)
- Selected State-wise Capacity Approved for Various Solar Parks in India
(As on 10.08.2023 and 30.11.2023)
- Selected State-wise Capacity Installed of Solar Power Plants by Railways in India
(As on 30.06.2023)
- Selected State-wise Capacity of Sanctioned Solar Parks in India
(As on 31.01.2023)
- Selected State-wise Installed Capacity of Solar Energy Projects under Various Stages of Implementation in India
(As on 30.06.2023)
- Selected State-wise Number of Parks, Sanctioned Capacity and Projects Installed Inside Solar Parks in India
(As on 20.07.2023)
- Selected State-wise Number of Solar Parks and Sanctioned Capacity under Scheme for Development
of Solar Parks and Ultra-Mega Solar Power Projects in India
(As on 30.06.2023)
- Selected State-wise Number of Solar Parks, Capacity Sanctioned and Projects Commissioned in India
(As on 30.11.2023)
- Selected State-wise Number of Solar Parks, Capacity Sanctioned and Projects Installed Inside Solar Parks in India
(As on 10.08.2023)
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2022-2023)
- State-wise Allocation and Installation of Capacity under Rooftop Solar Scheme (Phase - II) in India
(As on 31.07.2023)
- State-wise Cumulative Capacity Installed under Grid Connected Solar Rooftop Programme (Phase-II) in India
(As on 30.11.2023)
- State-wise Cumulative Installed Capacity under Grid Connected Solar Rooftop Programme in India
(As on 30.11.2023)
- State-wise Cumulative Solar Power Installed Capacity in India
(As on 31.03.2020, 30.06.2023 and 31.10.2023)
- State-wise Incentive Amount Released to Power Distribution Companies (DISCOMs) under Phase-II of Rooftop Solar Programme in India
(As on 30.11.2023)
- State-wise Number of Solar Photovoltaic (SPV) Systems (Cumulative) Installed in India
(2022 and 2023)
- Funds Released for Development of Solar Parks in India
(2019-2020 to 2022-2023-upto 30.06.2022)
- Location-wise Capacity Approved of Solar Photo Voltaic (PV) Modules by Ministry of New and Renewable Energy (MNRE) in India
(As on 04.03.2022)
- Progress of Energy Efficiency Services Limited/Convergence Efficiency Services Limited (EESL/CESLs) Decentralised Solar Projects in India
(2018-2019 to 2021-2022)
- Region/State-wise Target for Solar Power Capacity Installation in India (2022)
- Selected State-wise Addition of Solar Energy Capacity Installed under Ministry of New and Renewable Energy in India
(2019-2020 to 2022-2023-upto 30.06.2022)
- Selected State-wise Capacity Allocated and Installed in Residential Sector under Rooftop Solar Programme in India
(As on 30.06.2022)
- Selected State-wise Capacity of Sanctioned Solar Parks in India
(As on 31.01.2022)
- Selected State-wise Capacity Sanctioned and Commissioned of Solar Parks in India
(As on 30.06.2022)
- Selected State-wise Funds Released for Solar Energy to Citizens and Farmers under Citizen Centric Schemes in India
(2018-2019 to 2021-2022-upto 28.02.2022)
- Selected State-wise Funds Released for Solar Energy under Citizen Centric Schemes in India
(2019-2020 to 2022-2023-upto 30.11.2022)
- Selected State-wise Funds Released for Solar Parks under Scheme for Solar Park and Ultra-Mega Solar Projects in India
(2021-2022)
- Selected State-wise Installed Capacity of Solar Parks Approved under Scheme for Development of Solar Parks and Ultra Mega Renewable Energy Power Parks (UMREPPs) in India
(As on 30.11.2022)
- Selected State-wise Installed Capacity of Solar Parks Completed under Scheme for Development of Solar Parks and Ultra Mega Renewable Energy Power Parks (UMREPPs) in India
(As on 08.12.2022)
- Selected State-wise Number of Solar Parks with their Capacity Sanctioned and Commissioned in India
(As on 30.06.2022)
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2021-2022)
- State-wise Capacity Installed of Rooftop Solar Plants in India
(As on 28.02.2022)
- State-wise Capacity Required as Per Renewable Purchase Obligation (RPO) for Setting up of New Solar Projects by State Regulatory Commission in India (2021-2022)
- State-wise Cumulative Number of Solar Pump Sets Installed/Energisation in India
(As on 31.03.2022)
- State-wise Cumulative Solar Capacity Installed in India
(As on 30.06.2022)
- State-wise Expenditure under Rooftop Solar Programme in India
(2012-2013 to 2021-2022-upto 08.03.2022)
- State-wise Financial Assistance Provided for Solar Energy Programmes in India
(2018-2019 to 2021-2022-upto 28.02.2022)
- State-wise Funds Released under Solar Schemes of Ministry of New and Renewable Energy (MNRE) in India
(2019-2020 to 2021-2022)
- State-wise Power Generated from Solar Plants in India (2012-2013 to 2021-2022-upto January 2022)
- State-wise Solar Power Capacity Installed in India
(2018-2019 to 2022-2023-upto 30.06.2022)
- State-wise Solar Power Capacity Installed in India
(As on 28.02.2022)
- State-wise Solar Power Capacity Installed in India
(As on 30.06.2022)
- State-wise Solar Power Capacity Installed in India
(As on 31.10.2022)
- State-wise Solar Power Installed Capacity Addition in India
(As on 30.06.2017 and 30.06.2022)
- State-wise Solar Power Potential in India
(2018-2019 to 2022-2023-upto 30.06.2022)
- State-wise Target of Grid Connected Solar Power Capacity Generation in India (2021-2022)
- State-wise Targets for Installment of Solor Roof Top System (40000 MWp) Achived by Year (2022)
- State-wise Utility-Scale, Roof-Top and Off-Grid Solar Capacity Installed in India
(As on 30.06.2022)
- Target Fixed and Achievements Made for Development of Solar Energy under Jawaharlal Nehru National Solar Mission (JNNSM) in India (2010-2013, 2013-2017 and 2017-2022)
- Targets for Grid Connected of Rooftop and Large Scale Solar Power Capacity Installation in India (2015-2016 to 2021-2022)
- Capacity Addition in Solar Power Generation in India
(2018-2019 to 2020-2021)
- Location-wise Estimated Capacity Approved of Solar Photo Voltaic (PV) Modules by Ministry of New and Renewable Energy (MNRE) in India
(As on 10.03.2021)
- Project Location-wise Ground Mounted Grid Connected Solar Photo Voltaic Power Plants under Installation in Chhattisgarh
(As on 10.07.2021)
- Selected State-wise Capacity Allocated under Grid Connected Solar Rooftop Programme (Phase-II) in India
(2019-2020 and 2020-2021)
- Selected State-wise Capacity of Sanctioned Solar Parks in India
(As on 31.01.2021)
- Selected State-wise Capacity of Solar Rooftop Plants in India
(As on 23.03.2021)
- Selected State-wise Capacity of Various Solar Parks in India
(2020-2021)
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2020-2021)
- State-wise Allocation Capacity of Grid Connected Rooftop Solar Plants by Various Power Distribution Companies/Electricity Departments under
Grid-Connected Rooftop and Small Solar Power Plants Programme (Phase-II) in India
(2019-2020 and 2020-2021)
- State-wise Capacity Installed of Rooftop Solar Plants in India
(As on 28.02.2021)
- State-wise Cumulative Solar Capacity Installed in India
(As on 30.06.2021)
- State-wise Grid Connected Installed/Added Solar Power Capacity in India
(2016-2017 to 2020-2021)
- State-wise Grid Connected Solar Power Capacity Installed in India
(As on 28.02.2021)
- State-wise Number of Solar Photovoltaic (SPV) Systems (Cumulative) Installed in India
(2021)
- Agency-wise Expenditure Made under Roof Top Solar (RTS) Programme (Phase-I) in India
(As on 31.12.2020)
- Agency-wise Expenditure Made under Roof Top Solar (RTS) Programme (Phase-II) in India
(As on 31.12.2020)
- Company-wise Number of Ships Delivered in India
(2015-2016 to 2019-2020)
- Funds Released to Solar Energy Corporation of India Limited (SECI) under Central Public Sector Undertaking (CPSU) Scheme (Phase-II) in India
(2020-2021-upto 31.12.2020)
- Physical and Financial Target for Grid Connected Rooftop and Small Solar Power Plants Programme in India (2015-2016 to 2019-2020)
- Selected State-wise Allocation of Solar Photovoltaic (SPV) Systems and Standalone SPV Power Plants in India
(As on 31.12.2020)
- Selected State-wise Capacity of Solar Parks Approved in India
(As on 31.12.2020)
- Selected State-wise Central Financial Assistance (CFA) Released under Solar Park Scheme to Various Solar Power Park Developers (SPPDs),
State Transmission Utilities (STUs) and Central Transmission Utility (CTU) by Solar Energy Corporation of India
(As on 31.12.2020)
- Selected State-wise Funds Released to Various Projects/Organizations for Solar Photovoltaic (Off-Grid Solar Division) in India
(As on 31.12.2020)
- Selected State-wise Installed Capacity under Grid Connected Rooftop Solar Programme (Phase-I) in India
(As on 31.12.2020)
- Selected State-wise Number of Solar Street Lights, Study Lamps Sanctioned, Installed, Capacity of Power Packs under Off-Grid and Decentralised Solar Photovoltaic (PV) Applications Programme Scheme in India
(As on 31.12.2020)
- Selected State-wise Solar Photovoltaic (Off Grid Solar Division) Funds Released to Various Organizations in India
(As on 31.12.2020)
- Selected State-wise Solar Plant Capacity of Various Airports Operated by Airport Authority of India (AAI) in India (As on 20.06.2020)
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2019-2020)
- State-wise Cumulative Capacity of Grid Connected Solar Power Projects in India
(As on 31.12.2020)
- State-wise Cumulative Number of Installation of Solar Home Lights, Solar Lamps, Solar Street Lights, Solar Pumps and Capacity of Solar Power Plants under Off Grid and Decentralised Solar Photovoltaic (PV) Applications Programme in India
(As on 31.12.202
- State-wise Estimated Solar Energy Potential in India
(As on 31.12.2020)
- State-wise Funds Released for Grid Connected Solar Rooftop Project in India (2012-2013 to 2019-2020-upto 25.11.2019)
- State-wise Installed Capacity of Grid Connected Rooftop Solar Plant by Various Power Distribution Companies/Electricity Departments
under Grid-Connected Rooftop and Small Solar Power Plants Programme (Phase-I) in India
(As on 31.12.2020)
- State-wise Number of Solar Home Lights, Lamps, Street Lights, Pumps Installed and Capacity of
Solar Power Plants under Off -Grid Solar Photovoltaic (SPV) Programme in India
(2020-2021-upto 31.12.2020)
- State-wise Number of Solar Photovoltaic Systems (Cumulative) Installed in India
(As on 31.12.2020)
- State-wise Number of Solar Pumps Set up in India (2016-2017 to 2019-2020-upto 31.10.2019)
- State-wise Number of Standalone Solar Pumps installed under Schemes by Ministry of New and Renewable Energy in India (2016-2017 to 2019-2020-upto 31.10.2019)
- State-wise Physical Progress of Suryamitra Training in India (2015-2019 and 2019-2020)
- State-wise Solar Power Installed Capacity in India (As on 29.02.2020)
- Capacity of Ongoing Solar Projects (Government Building) in Kerala
(As on 31.03.2019)
- Central Financial Assistance Released under Solar Off-Grid Programme in India (2016-2017 to 2019-2020)
- Funds Released under Solar Programme in India (2012-2013 to 2018-2019-upto 30.06.2018)
- Installed Capacity of Completed Solar Projects in Kerala
(As on 31.03.2019)
- Selected State-wise Capacity Installed under Off-Grid Solar Photovoltaic (SPV) Programme in India (2018-2019)
- Selected State-wise Central Financial Assistance (CFA) Released to Central Public Sector Undertakings (CPSUs)/Government Organisations by Solar Energy Corporation (SEC) in India (2015-2016 to 2019-2020)
- Selected State-wise Central Financial Assistance (CFA) Released to State Government Organisations by IREDA under Rooftop PV and Small Solar Power Generation Programe (RPSSGP)/Solar GBI Scheme in India (2015-2016 to 2018-2019-upto 30.06.2018)
- Selected State-wise Central Financial Assistance (CFA) Released under Solar Park Scheme to Various Solar Power Park Developers (SPPDs), State Transmission Utilities (STUs) and Central Transmission Utility (CTU) by Solar Energy Corporation of India (As on 31.10.2019)
- Selected State-wise Central Fund Released, Sanctioned and Utilized to Various Agencies for Development of Solar Parks and Ultra Mega Solar Projects under Solar Park Scheme in India (2014-2015 to 2018-2019-upto 30.09.2018)
- Selected State-wise Physical Progress of Varunmitra (Solar Water Pumping) Training in India (2018-2019)
- Selected State-wise Progress of Roof Top Solar Grid Engineer Training in India (2018-2019)
- Selected State-wise Solar Selected State-wise Solar Photo Voltaic Pumps Installed under Off-grid Solar Photo Voltaic (SPV) Programme in India (2017-2018 and 2018-2019)
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2018-2019)
- State-wise Allocation of Solar Photovoltaic (SPV) Systems and Standalone SPV Power Plants in North Eastern Region in India (As on 31.03.2019)
- State-wise Capacity Installed of Solar Photovoltaic (SPV) Systems under Grid Connected Rooftop Solar Programme in India (As on 04.12.2019)
- State-wise Capacity of Rooftop Solar Projects Sanctioned in India (As on 12.02.2019)
- State-wise Capacity of Various Solar Parks in India (As on 31.12.2019)
- State-wise Cumulative and Commissioned Capacity of Grid Connected Solar Power Projects in India (As on 31-03-2017, 31-12-2017, 2017-2018 and 31.05.2019)
- State-wise Cumulative Capacity Installed for Off-Grid Solar Applications under Off-grid Solar Photo Voltaic (SPV) Programme in India (As on 31.03.2019)
- State-wise Number of Solar Photovoltaic Systems (Cumulative) Installed in India (As on 31.12.2019)
- State-wise Number of Solar Street Lights Installed under Ministry of New and Renewable Energy (MNRE) Scheme in India (As on 31.10.2019)
- State-wise Sanctioned Capacity of Rooftop Solar Projects in North Eastern Region in India (As on 31.03.2019)
- State-wise Solar Rooftop Systems Capacity Commissioned under Rooftop PV and Small Solar Power Generation Programme (RPSSGP) in India (As on 31.03.2019)
- Status of Ongoing Solar Projects in Kerala
(As on 31.03.2019)
- Clean Energy Generated by Various Solar Parks in India As on 31.10.2018
- Funds Released for Installation of Grid Connected Solar Power in India (2014-2015 to 2017-2018-upto June 2017)
- Number of Solar Pump Installed in India (2013-2014 to 2017-2018-upto 31.12.2017)
- Selected State-wise Capacity of Ongoing Solar Power Projects under Various Schemes in India (As on 08.03.2018)
- Selected State-wise Number of Solar Pumps Sanctioned for Irrigation and Drinking Water Purposes in India (2017-2018)
- Selected State-wise Status of Capacity of Solar Parks in India (As on 28.02.2018)
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2017-2018)
- State-wise Grid Connected Rooftop Solar Power Plants Capacity Installed in India (As on 16.07.2018)
- State-wise Grid Connected Solar Power Potential and Total Cumulative Solar Capacity Installed in India (As on 31.01.2018, 30.06.2018, 31.07.2018 and 30.11.2018)
- State-wise Installed Capacity of Rooftop Solar Projects in North-Eastern Region of India (As on 31.01.2018)
- State-wise Installed Capacity of Solar Power Projects in India (As on 30.06.2018)
- State-wise Number of Grid Connected Solar Power Plants Setup and their Capacity under Programmes of Ministry of New and Renewable Energy (MNRE) in India (2009-2010 to 2017-2018 upto 31.01.2018 )
- State-wise Number of Solar Water Pumps Installed in India (As on 31.12.2018)
- Status of Tenders for Ground Mounted Solar Projects for Commissioning under Jawahar Lal Nehru National Solar Mission (JNNSM) in India (2016-2017 and 2017-2018)
- Total Tenders Issued of New Solar Energy Projects under Central and State Schemes in India (2016-2017 and 2017-2018-upto June 2017)
- Number of Solar Home Lighting Systems Installed in India (2013-2014 to 2017-2018-upto 31.12.2017)
- Number of Solar Street Lights in India (2013-2014 to 2017-2018-upto 31.12.2017)
- Selected State-wise Capacity and Funds Released for Various Solar Park under Solar Park Scheme in India (2016-2017)
- Selected State-wise Number of Households Benefitted from Solar Lanterns,Solar Home Lights and Solar Pumps in India (2007-2012 and 2012-2017)
- Selected State-wise Number of Solar Pumps Sanctioned and Funds Released under Saur Sujala Yojana in India (As on 01.04.2014 to 30.06.2017)
- Selected State/Company-wise Installed Capacity of Solar Panel/Modules in India
(As on 31.12.2017)
- State/Month-wise Renewable Energy Generation from Solar Power Stations in India
(2016-2017)
- State-wise Cumulative Capacity Installation of Off-Grid Solar Photovoltaic (SPV) Power Plants with Energy Storage in India (2013-2014 to 2016-2017-upto 28.02.2017)
- State-wise Cumulative Capacity Installation of Solar Power Energy in India (As on 30.06.2017)
- State-wise Cumulative Installation of Solar Photovoltaic (SPV) Systems in India (As on 31.12.2017)
- State-wise Cumulative Sanctioned of Solar Water Pumps in India (As on 28.02.2017)
- State-wise Grid Connected Solar Power Installed Capacity under Phase-II of National Solar Mission (NSM) in India (April, 2013 to March, 2017)
- State-wise Solar Energy Potential and Installed Capacity in North-Eastern Region of India (As on 31.12.2017)
- State-wise Solar Photovoltaic (SPV) System Installation in India (2017-2018-upto 31.12.2017)
- State-wise Solar Photovoltaic (SPV) Systems and Standalone Power Plants in North-Eastern Region of India (As on 31.12.2017)
- State-wise Status of Solar Photovoltaic (SPV) Systems Installed in India (2016-2017-upto 31.12.2016)
- Expenditure on Research and Development Activities by Ministry of New and Renewable Energy (MNRE) and Department of Science and Technology in Solar Energy Sector in India (2012-2013 to 2015-2016-upto 26.02.2016)
- Selected State-wise Capacity Allocation of Canal Solar Projects and Commissioned in India (As on 31.12.2016)
- Selected State-wise Funds Released for Setting up of Grid Connected Solar Power Plants in India (2012-2013 to 2015-2016)
- Selected State-wise Funds Released under Solar Pumping Programme for Irrigation and Drinking Water in India (2014-2015 and 2015-2016-upto 07.12.2015)
- Selected State-wise Grid Interactive Solar Rooftop Approval and Achievement in India (2015-2016)
- Selected State-wise Number of Solar Pumps Installed for Irrigation and Drinking Water in India (2012-2013 to 2015-2016-upto 30.06.2015)
- State-wise Fund Allocated and Released for Grid Connected Solar Rooftop in India (2012 to 2015-2016)
- State-wise Number of Solar Street Light (STL) Installed in India (2013-2014 to 2015-2016-upto 30.09.2015)
- State-wise Number of Suryamitras Batches Approved for Training and Suryamitras Trained/Under Training for Solar Photovoltaic based Installation in India (2015-2016)
- Achievements of Solar Water Heating (SWH) System under Jawahar Lal Nehru National Solar Mission (JNNSM) in India (2002-2003 to 2014-2015)
- Funds Sanctioned/Released/Spent for Grid Connected Solar Power Projects by Ministry of New and Renewable Energy in India (2009-2010 to 2014-2015)
- Sanctioned Capacity of Grid Connected Solar Photovoltaic Power Projects by CPSUs and Government Organization under MNRE Scheme in India (January, 2015)
- Selected State-wise Capacity of Solar Parks Approved in India (As on 31.12.2015)
- Selected State-wise Central Financial Assistance (CFA) Released for Installing Solar Pumps in India (2011-2012 to 2014-2015)
- Selected State-wise Comissioning Status of Grid Connected Solar Power Projects under Jawaharlal Nehru National Solar Mission (JNNSM) in India (As on 31.12.2015)
- Selected State-wise Installed Capacity of Grid Connected Solar Power Projects in India (As on 11.05.2012 and 11.12.2015)
- Selected State-wise Installed Grid Connected Solar Power Capacity under Jawaharlal Nehru National Solar Mission (JNNSM) in India (As on February, 2015)
- Selected State-wise Number of Beneficiaries and Fund Released under Decentralized Solar Applications Programme in India (2009-2010 to 2014-2015)
- Selected State-wise Number of Villages Covered with Solar Lighting Systems in India (2012-2013 to 2014-2015)
- State-wise Cumulative Installation of Solar Photovoltaic (SPV) Systems in India (As on 31.03.2015)
- State-wise Estimated Solar Energy Potential and Total Commissioned Capacity In India (As on February, 2015 and 26.11.2015)
- State-wise Funds Released to Solar Energy Corporation (SEC) under Solar Park Scheme in India (As on 07.12.2015)
- State-wise Status of Solar Energy Pumping System Sanctioned and Installed under Scheme of Ministry of New and Renewable Energy (MNRE) in India (As on 30.09.2015)
- Target of Ground Mounted Solar Power Project under Jawahar Lal Nehru National Solar Mission (JNNSM) in India (2015-2016 to 2021-2022)
- Cumulative Achievement of Box and Dish Type Solar Cooker and Concentrating Solar Thermal (CSTs) Systems in India (As on December, 2014)
- Selected State-wise Sanctioned amount for installation of Solar Pumps in India (2010-2011 to 2013-2014)
- Selected State-wise Status of Grid Connected Solar Photovoltaic Power Projects Commissioned under Jawaharlal Nehru National Solar Mission (JNNSM) in India (2013-2014)
- State-wise Cumulative Installation of Solar Lanterns and Solar Home Lights in India (As on 31.03.2014)
- State-wise Cumulative Installation of Solar Water Pumps in India (As on 31.10.2014)
- State-wise Number and Capacity of Grid Connected Solar Power Plants Installed under Ministry of New Renewable Energy (MNRE) in India (As on 30.06.2014)
- State-wise Number of Households Having Solar Lighting System under Ministry of New Renewable Enegry (MNRE) in India
(As on 31.12.2014)
- Selected State-wise Cumulative Installation of Solar Photovoltaic (SPV) Systems in India (As on 31.03.2013)
- Selected State-wise Number of Solar Lanterns (SL), Solar Home Lights (HL) and Solar Street Lights (STL) Installed in India (2009-2010 to 2012-2013)
- Selected State-wise Status of Projects Sanctioned for Solar Water Heating Programme under Jawaharlal Nehru National Solar Mission (JNNSM) in India (2010-2011 to 2012-2013)
- State-wise Cumulative Grid-Interactive Solar Power Generation Capacity in India (As on 28.02.2013)
- State-wise Cumulative Installation of Off-Grid Solar Photovoltaic (SPV) Power Plants in India (As on 31.01.2013)
- State-wise Grid Solar Power Projects Allotted and Commissioned under Jawaharlal Nehru National Solar Mission (JNNSM) in India (As on 31.01.2013)
- Selected State-wise Amount Released of Subsidy/Refinance by NABARD for Solar Home Lights and Solar Water Heaters under Jawaharlal Nehru National Mission Implemented by Ministry of New and Renewable Energy (MNRE) in India (2010-2011 to 2012-2013-Upto 31.07.2012)
- Selected State-wise Cumulative Installation of Solar Photo Voltaic (SPV) Systems in India (2008-2009 to 2011-2012-upto 31.10.2011)
- Selected State-wise Cumulative Installation of Solar Photovoltaic (SPV) Systems in India (As on 31.03.2012)
- Selected State-wise Installation of Solar Photovoltaic (SPV) Off-Grid System in India (As on 31.12. 2012)
- Selected State-wise Number and Capacity of Standalone Solar Photovoltaic Power Projects in Schools, Colleges and Universities by Ministry of New and Renewable Energy of India (2011-2012-Upto 29.02.2012)
- Selected State-wise Number of Solar Home Lights and Water Pumping System Sanctioned by Ministry of New and Renewable Energy in India (2011-2012-Upto 29.02.2012)
- Selected State-wise Projects Sanctioned for Off-grid Solar Applications under Jawaharlal Nehru National Solar Mission (JNNSM) in India (as on 31.12.2012)
- State-wise Cumulative Grid Solar Power Commissioned in India (As on 31.10.2012)
- State-wise Cumulative Installation of Solar Photovoltaic (SPV) Systems and Power Plants in India (2009-2010 to 2012-2013-upto 31.10.2012)
- State-wise Cumulative Installation of Solar Photovoltaic (SPV) Systems in India (As on 31.03.2012)
- State-wise Number of Akshay Urja Shops/Aditya Solar Shops Sanctioned in India (2005-2006 to 2011-2012)
- Selected State-wise Capacity of Grid Solar Power Projects in India (As on 31.01.2011)
- Selected State-wise Number of Remote Villages/Hamlets Sanctioned and Electrified through Solar Energy in India (2008-2009 to 2010-2011)
- Selected State-wise Number of Solar Lanterns and Home Lights Installed in India (2008-2009 to 2010-2011)
- Selected State-wise Number of Solar Photovoltaic and Solar Thermal Power Projects Installed in India (As on 24.11.2011)
- Selected State-wise Number of Solar Powered Refrigerators Issued in India (2010-2011)
- State/Location-wise Capacity of Grid Solar Power Plants in India (As on 31.07.2011)
- State-wise Cumulative Installation of Solar Photo Voltaic (SPV) Systems in India (As on 28.02.2011)
- State-wise Stand-Alone and Grid Connected Solar Photo Voltaic (SPV) Power Projects (Cumulative) Installed in India (2008-2009 to 2010-2011)
- Selected State-wise Capacity Installed of Grid Connected Solar Power Plants in India (As on 31.10.2010)
- Selected State-wise Capacity of Solar Photovoltaic Projects Implemented under Solar Photovoltaic Programme in India (As on 10.08.2010)
- Selected State-wise Number of Remote Villages/Hamlets Electrified through Solar Energy in India (As on 30.03.2010)
- Selected State-wise Number of Remote Villages/Hamlets Taken up for Electrification/Lighting through Solar Energy in India (2007-2008 to 2010-2011-Upto 26.07.2010)
- Selected State-wise Power Generation Installed Capacity alongwith Electricity Generation from Renewable Energy Resource (Solar Power) in India (2007-2008 to 2010-2011-upto 30.06.2011)
- Selected State-wise Status of Grid Connected Solar Power Projects under Jawaharlal Nehru National Solar Mission (JNNSM) in India (As on 31.10.2010)
- State-wise Cumulative Installation of Solar Photo Voltaic (SPV) Systems and Power Plants in India (As on 31.03.2010)
- State-wise Number of SPV Lighting Systems Distributed/Installed under Ministry of Solar Photovoltaic (SPV) Programme in India (2006-2007 to 30.11.2009)
- Selected State-wise Installed Capacity of Grid Interactive Solar Photovaltaic (SPV) Power Projects in India (As on 31.03.2008)
- Selected State-wise Number of Manufacturers of Solar Photovoltaic (SPV) Cells/Modules, Flat Plate Collector (FPC) and Evacuated Tube Collector (ETC) based Solar Water Heaters and Solar Cookers in India (As on April, 2008)
- Selected State-wise Number of Villages and Hamlets Sanctioned under Programme for Provision of Solar Energy Systems in India (2006-2007 and 2007-2008)
- State-wise Funds Released under Solar Energy Programmes of India (2000-2001 to 2002-2003 and 2004-2005 to 2007-2008)
- State-wise Solar Photovoltaic (SPV) Systems Installations under Ministry of New and Renewable Energy (MNRE) SPV Programme in India (2004-2005 to 2006-2007)
- Selected State-wise Installed Capacity of Grid Interactive Solar Photovoltaic (SPV) Power Plant Projects in India (1992-1993 to 2005-2006)
- Selected State-wise Villages/Hamlets Sanctioned for Providing Solar Energy Devices under Remote Village Electrification Programme in India (2003-2004 to 2005-2006)
- Proposals Received and Sanctioned for Solar Energy Installation in India (2003-2004 and 2004-2005)
- Selected State-wise Number of Aditya Solar Shops Established in India (2004-2005)
- Electricity Generated by Grid- Interactive SPV Power Projects in India (2003-2004)
- State-wise Quantum of Electricity Likely to be Generated through Panels Installed with Various Solar Photovoltaic Systems in India (2000-2001 to 2002-2003 and As on 30.06.2004)
- State-wise Status of Estimated Potential of Renewable Energy Source in India ( As on 31.12.2004)
- State-wise Achievements Made Under Solar Cooker Programme in India (1998-1999 to 2002-2003)
- State-wise Achievements Made Under Solar Photovaltaic Pumps Programme in India (1998-1999 to 2002-2003)
- State-wise Achievements made under Solar Photovoltaic Power Programme in India (1998-1999 to 2002-2003)
- State-wise Achievements Made Under Solar Photovoltaic Programme in India (2001-2002 and 2002-2003)
- State-wise Cumulative Sale on Solar Cookers and Status of Aditya Shops Established in India (As on 31.03.2003)
- State-wise Number of Aditya Solar Shops in India (2002-2003)
- State-wise Number of Concentrating Solar Cookers Installed in India (As on 31.03.2003)
- State-wise Solar Photovoltaic Systems Installed in India (As on 31.03.2003)
- Achievements under Solar Photovoltaic Programme (During 1998-1999 to 2001-2002)
- State-wise Achievements of Solar Photovoltaic Systems and Power Plants (As on 31.03.2002)
- State-wise Details of Solar Power Plants Installed under the the Ministry Programmes and the Estimated Annual Energy Generation from these Power Plants in India (As on 31.03.2002)
- State-wise Estimated Energy Generated From Solar Photovoltaic (SPV) System and Power Plants Installed Under the Ministry Programme in India (1995-1996 to 2001-2002)
- State-wise Physical Targets Fixed and Estimated Financial Assistance Proposed under Family-size Biogas Plants, CBP/IBP/NBP, Improved Chulha, Solar Photovoltaic Programme in India (During 2001-2002)
- State-wise Solar Energy Systems/Devices Installed in India (1999-2000 to 2001-2002)
- State-wise Achievements Made Under Solar Photovoltaic Programme in India (1998-1999 to 2000-2001)
- State-wise Estimated Annual Energy Generation from SPV System in India (As on 31.3.2001)
- State-wise Solar Energy Power Plants Installed in India (During 1998-1999 to 2000-2001)
- State-wise Solar Power Plant Proposals Received from State Agencies in India (During 2000-2001)
- State-wise Solar Power Plant Proposals Received from State Agencies in India (During 1999-2000)
- State-wise Solar Power Plant Proposals Received from State Agencies in India (During 1998-1999)
- State-wise Installation of Solar Photovoltaic System in India (As on 31st December, 1996)
- State-wise Solar Photovoltaic Pumping Systems in India ( As on 31.01.1995)
- State-wise Distribution of Solar Thermal Systems in India (As on 31-03-1993)